Identification and assessment of disruption claim management risks in construction projects: a life cycle-based approach

Author:

Cevikbas Murat,Okudan OzanORCID,Işık Zeynep

Abstract

PurposeThe purpose of this paper is to propose a disruption claim management (DCM) life cycle and a risk management framework to provide comprehensive guidance to construction practitioners for facilitating effective and efficient DCM.Design/methodology/approachDCM life cycle was initially developed through a focus group discussion (FGD) with the participation of the construction practitioners who have diverse experiences about DCM. The life cycle is comprised of 6 phases and also includes proper reactions of the owners and contractors. Then, 42 risk factors that can impact the deliverables of DCM were identified through a literature review and an additional FGD session. This was then followed by a Fuzzy Analytical Hierarchy Process (FAHP) which was performed to evaluate the importance of each risk factor in terms of the factor's impact on the success of DCM. Additionally, consistency analysis was performed to further maximize the reliability of the results.FindingsFindings revealed that a proactive and systematic approach should be adopted and DCM practices should be initiated before any disruption event is triggered. Accordingly, the proposed framework recommends DCM practices to be initiated early in the contract development phase since compensation for the disruption might be recovered only to the extent that the contract permits. The contract-related risks were given top priority by the experts so that the results of the fuzzy AHP analysis also verified the significance of the contract development phase. Besides contract-related risks, risks related to insufficient site observation, ignorance of the project team, cognitive bias and conflict of interest were determined as the most significant DCM risks, needing an urgent and sophisticated risk response plan. Lastly, results suggested that “Site observation and record-keeping” is the most formidable phase since the phase's implementation on a continuous basis could create unforeseen organizational challenges such as mismanagement of project records, especially in the dynamic and turbulent environment of the construction projects.Originality/valueDisruption – which is caused mostly by change – is inevitable in construction projects due to their sophisticated nature. DCM, therefore, becomes crucial to compensate losses of contractors and eliminate or diminish the prolonged dispute resolution process. Existing studies, however, do not provide a comprehensive theoretical basis for the DCM life cycle and DCM life cycle's potential risks so that DCM life cycle's promising benefits can hardly be materialized. Thus, developing a DCM life cycle and associating DCM life cycle with risk management, this study is highly believed to make a promising theoretical contribution to the DCM domain since this is one of the earliest attempts in the literature. Additionally, this research provides construction practitioners with an insight into the effective implementation of DCM practices in construction projects.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference75 articles.

1. Forensic schedule analysis;AACE,2011

2. Avoiding and mitigating delay and disruption claims conflict: role of precontract negotiation;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction,2009

3. Using PLS-PM to model the process of inter-project learning in construction projects;Automation in Construction,2014

4. Managing computational complexity using surrogate models: a critical review;Research in Engineering Design,2020

5. Performance evaluation of complex electricity generation systems: a dynamic network-based data envelopment analysis approach;Energy Economics,2020

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3