Moderating claims and disputes through collaborative procurement

Author:

Elhag Taha,Eapen Smitha,Ballal Tabarak

Abstract

Purpose Following the global financial crisis in 2008, the construction sector in UAE has been facing emergent criticisms for growing adversarial culture and rising prevalent claims and disputes between stakeholders. The complex, large size and fast track nature of construction projects in UAE, make project management very challenging under the commonly used traditional procurement routes. This paper aims to examine whether implementing collaborative procurement approaches can facilitate resolving the escalating number of claims and disputes in the UAE construction industry. Design/methodology/approach Considering the nature of the study, a quantitative method was selected to realize the research objectives. The questionnaire was uploaded using an online survey facility and distributed through e-mails and professional networks. The questionnaire was piloted with experts to assess whether the questions are unambiguous, easy to respond and intelligible. The feedback received was mostly positive with few comments and recommendations. The pilot responses were incorporated and the questionnaire was modified before the final sending out. The questionnaire survey consisted of six main sections to fulfill the research objectives. Findings Around three-quarters of the experts believe that the relationship is adversarial, with a lack of trust, win-lose attitude, with dismissive and opportunistic behavior. The survey reveals that the top causes of claims and disputes comprise the following: variations because clients initiated change requests; contractors selection on low bid only rather than including quality and performance considerations; and unfair risk allocation where majority of risks are transferred to contractors. The findings also identify eight collaborative practices, which have crucial positive impacts such as early identification of problems, better communication and enhanced trust and teamwork. Originality/value This research contributes to the enhancement of the management of claims and disputes for construction projects, which encompasses the following: the key characteristics of collaborative arrangements to improve the adversarial construction culture comprise: mutual respect, openness, fairness and non-opportunistic behaviors; the foremost roles of collaborative procurement in reducing claims and disputes embrace: early identification and resolution of problems, enhanced trust and teamwork spirit, improved relationships and better quality communication; the major practical barriers of implementing collaborative approaches incorporate: lack of awareness of their benefits, primitive legal framework of partnering arrangements and lack of transparency in procurement processes.

Publisher

Emerald

Subject

Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering

Reference45 articles.

1. Effect of relational characteristics on management of wind farm interorganizational construction projects;Journal of Construction Engineering and Management,2019

2. Partnering in major contracts: paradox and metaphor;International Journal of Project Management,2007

3. Conceptual model of partnering and alliancing”. ASCE;Journal of Construction Engineering and Management,2007

4. Asamoah, W. (2012), “Transforming Middle East procurement”, available at: www.fgould.com/middle-east/articles/transforming-middle-east-procurement. (accessed 12 March 2016).

Cited by 19 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3