Development of an approach to incorporate proportional hazard modelling into a risk-based inspection methodology

Author:

Lelo Nzita AlainORCID,Stephan Heyns P.,Wannenburg Johann

Abstract

PurposeIndustry decision makers often rely on a risk-based approach to perform inspection and maintenance planning. According to the Risk-Based Inspection and Maintenance Procedure project for the European industry, risk has two main components: probability of failure (PoF) and consequence of failure (CoF). As one of these risk drivers, a more accurate estimation of the PoF will contribute to a more accurate risk assessment. Current methods to estimate the PoF are either time-based or founded on expert judgement. This paper suggests an approach that incorporates the proportional hazards model (PHM), which is a statistical procedure to estimate the risk of failure for a component subject to condition monitoring, into the risk-based inspection (RBI) methodology, so that the PoF estimation is enhanced to optimize inspection policies.Design/methodology/approachTo achieve the overall goal of this paper, a case study applying the PHM to determine the PoF for the real-time condition data component is discussed. Due to a lack of published data for risk assessment at this stage of the research, the case study considered here uses failure data obtained from the simple but readily available Intelligent Maintenance Systems bearing data, to illustrate the methodology.FindingsThe benefit of incorporating PHM into the RBI approach is that PHM uses real-time condition data, allowing dynamic decision-making on inspection and maintenance planning. An additional advantage of the PHM is that where traditional techniques might not give an accurate estimation of the remaining useful life to plan inspection, the PHM method has the ability to consider the condition as well as the age of the component.Research limitations/implicationsThis paper is proposing the development of an approach to incorporate the PHM into an RBI methodology using bearing data to illustrate the methodology. The CoF estimation is not addressed in this paper.Originality/valueThis paper presents the benefits related to the use of PHM as an approach to optimize the PoF estimation, which drives to the optimal risk assessment, in comparison to the time-based approach.

Publisher

Emerald

Subject

Industrial and Manufacturing Engineering,Strategy and Management,Safety, Risk, Reliability and Quality

Reference21 articles.

1. Expressing and interpreting the results of quantitative risk analyses. Review and discussion;Reliability Engineering and System Safety,1998

2. Journal of loss prevention in the process industries dynamic risk-based inspection methodology;Journal of Loss Prevention in the Process Industries,2019

3. Through-life diagnostic information using the proportional hazards model;South African Journal of Industrial Engineering,2013

4. Regression models and life-tables;Journal of the Royal Statistical Society: Series B (Methodological),1972

5. Principles of failure probability assessment (PoF);International Journal of Pressure Vessels and Piping,2004

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3