1. Anon (1994), Build‐time Estimate Program “Slitime”, Clemson University, Clemson, SC.
2. Predicting total build‐time and the resultant cure depth of the 3D stereolithography process
3. Kamash, T. and Flynn, D. (1995), Build Time Estimator for Stereolithography Machines – A Preliminary Report, Prototype Express, Schaumburg, IL.
4. Osorio, A. (1995), Estimating Building Times for the STEREOS 300, EARP Report No. 7, pp. 14‐16.