1. Ahsan, K.
(2012), “Determinants of the performance of public sector development projects”,
International Journal of Management
, Vol. 29 No. 1, pp. 77-90, Part 1.
2. Albanese, R.
(1994), “Teambuilding: key to better project results”,
Journal of Management in Engineering
, Vol. 10 No. 6, pp. 36-44.
3. Ameh, J.
and
Odusami, K.T.
(2007), “Nigerian building professionals
'
ethical ideology and perceived ethical judgment”,
Construction Research Journal
, Vol. 2 No. 1, pp. 32-42.
4. Babatunde, S.O.
,
Opawole, A.
and
Ujaddugbe, I.C.
(2001), “An appraisal of project procurement methods in the Nigerian construction industry”,
Civil Engineering Dimension
, Vol. 12 No. 1, pp. 1-7.
5. Bayracktar, M.E.
,
Hastack, M.
,
Gokale, S.
and
Safi, B.
(2011), “Decision tool for selecting optimal techniques for cost and schedule reduction in capital projects”,
Journal of Construction Engineering and Management
, Vol. 137 No. 9, pp. 645-655.