1. Acur, N. and Bititci, U.S. (2003), “Managing strategy through business processes”, Production Planning and Control, Vol. 14 No. 4, pp. 309‐23.
2. Bititci, U.S., Carrie, A.S. and Turner, T. (1998), “Diagnosing the integrity of your performance measurement systems”, Institute of Operations Management Publication.
3. Childe, S.J., Maull, R.S. and Bennett, J. (1994), “Frameworks for understanding business process re‐engineering”, International Journal of Operations and Production Management, Vol. 14, pp. 22‐34.
4. Creighton, S., Turner, T. and Bititci, U.S. (2000), “Intranet based performance measurement systems at Alcan Foil Europe in Glasgow”, IFIP WG 5.7 Conference Proceedings, International Conference on Integrated Production Management, pp. 15‐23.
5. DTI (1996), Factory of the Future, DTI, London, UK.