Challenges to the implementation of building management systems in Saudi Arabia

Author:

Hassanain Mohammad A.,Bin-Mohanna Ameen,Al-Hammad Abdul-Mohsen,Sanni-Anibire Muizz O.

Abstract

Purpose The purpose of this paper is to present an assessment of the challenges to the implementation of building management systems (BMS) in Saudi Arabia, during the life cycle of building projects. Design/methodology/approach Review of literature and interviews were conducted with professionals to identify and synthesize the challenges to the implementation of BMS in Saudi Arabia. This formed the basis of three questionnaire surveys that were designed utilizing a five-point Likert scale, and consisted of 32 challenges. The surveys were assessed by representatives of architectural/engineering (A/E) firms, BMS installation sub-contractors and facilities managers to calculate the effect index of each challenge. Findings The top influential challenges pertaining to the briefing and design phase includes “inappropriate selection of the BMS,” “inappropriate selection of the A/E team”; installation and final acceptance phase includes “inappropriate selection of sub-contractors to install the BMS” and “inappropriate selection of the BMS suppliers,” operation and maintenance phase includes “inadequate initial training for the BMS facility personnel,” “poor operation and maintenance activities.” Practical implications The paper is of practical benefit to stakeholders in the building industry, as it allows for the development of an effective BMS implementation plan. Originality/value The study increases the level of awareness in the building industry about the challenges that influence the implementation of BMS.

Publisher

Emerald

Subject

Management Science and Operations Research,Civil and Structural Engineering

Reference49 articles.

1. Project supervisor at King Fahd University of Petroleum and Minerals,2012

2. BMS operator at Eastern Cement Towers,2012

3. Facility manager at Al-Turki Towers,2012

4. Manager, operation and maintenance department at Asharqia Chamber,2012

5. Systems project manager at Johnson Controls,2012

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3