PurposeHighway projects in India have a history of cost overruns and delay in project delivery, thus incurring huge losses to public funds. The study aimed to measure the extent of influence of various constraints on the overall success of highway projects (e.g. National highway project, state highway projects and major district roads). Based on the literature, various factors were grouped under three categories (a) Project Constraints, (b) Project Governance Constraints and (c) Stakeholder Induced Constraints.Design/methodology/approachA quantitative approach was adopted. A questionnaire-based survey was conducted with 435 respondents from the field of highway projects with a minimum experience of 1 year as Project Manager. The data was analyzed by partial least squares structural equation modeling technique.FindingsIt was identified that the impact of project constraints (ES = 0.313) on project success is more than that of project governance constraints (ES = 0.231) and stakeholder induced constraints. Additionally, it was found that project governance constraints have a strong impact on project constraints (ES = 0.535) and stakeholder induced constraints (ES = 0.403).Originality/valueThe study presented in this paper is first of its kind to measure and articulate the impact of project governance constraint, project constraint and stakeholder induced constraints on project success.
Subject
Civil and Structural Engineering,Building and Construction,Architecture,Engineering (miscellaneous),Urban Studies
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献