Author:
Annunen Petteri,Tella Juho,Pekki Sini,Haapasalo Harri
Abstract
Purpose
This study describes how maintenance capability should be created during the design and construction phases of construction projects. Purpose of the abstract to define the elements for creating the maintenance capability and the process to be used in construction life cycle projects for buildings.
Design/methodology/approach
An inductive and qualitative research method was used to construct the proposed process based on the literature and 18 interviews in two large construction companies.
Findings
The results indicate that the maintenance phase is usually overlooked during the design and construction phases, and capabilities are not systematically built. In particular, processes are lacking in data management, causing severe problems in maintenance.
Originality/value
This study presents a process including key requirements and activities for creating maintenance capability in conjunction with the design and construction phases, which is novel to the literature. The validated process can be adapted based on the needs of the construction company.
Subject
Management of Technology and Innovation,Strategy and Management,Business and International Management
Reference47 articles.
1. A framework for stakeholder identification and classification in construction project;Open Journal of Business and Management,2014
2. Sales capability creation during new product development – early involvement of sales;Journal of Business and Industrial Marketing,2021
3. Comparing PLM and BIM from the product structure standpoint,2016
4. Using thematic analysis in psychology;Qualitative Research in Psychology,2006