Author:
Tsai Sung Lun,Ochiai Chiho,Deng Chuan Zhong,Tseng Min Hui
Abstract
Purpose
Several post-disaster housing extension and modification studies have indicated that owner-driven modification behavior relates to socio-economic and livelihood factors. This study aims to clarify housing extension patterns and examine the relationships among spatial characteristics, sociocultural factors, livelihood factors and housing extensions. This research also highlights the implications of post-disaster housing design for indigenous communities.
Design/methodology/approach
An indigenous community case study was conducted using a literature review. Moreover, interview surveys and housing measurements were implemented based on purposive sampling to diversify interviewees’ backgrounds and the extent of housing extensions.
Findings
This study confirms that housing extensions are closely related to the number of household members and their associated functions and cultural and livelihood factors that were ignored during the design stage. Furthermore, the housing extension process was confirmed to match households’ economic recovery. A post-disaster housing implementation framework for the indigenous population is proposed.
Research limitations/implications
This research only targeted one indigenous community with a limited number of interviewees and samples because of the connection with households.
Practical implications
The study’s proposed resilience post-disaster housing framework can be used to develop post-disaster housing design guidelines, which can benefit policymaking. The proposed participatory concept can be further adopted in future disaster risk-reduction programs.
Originality/value
This study uniquely focuses on the pre- and post-disaster housing layout and the livelihood of an indigenous community. It offers valuable insights for post-disaster reconstruction planners and practitioners.
Subject
Safety, Risk, Reliability and Quality,Building and Construction
Reference45 articles.
1. Post-tsunami resettlement in Sri Lanka and India: site planning, infrastructure and services;International Journal of Disaster Resilience in the Built Environment,2014
2. APEC (2013), “Building natural disaster response capacity: sound workforce strategies for recovery and reconstruction in APEC economies”, Working paper, APEC Natural Disaster Workforce Project, November.
3. Initial Organisational Formation of the Housing Reconstruction Programme in Bam
4. Compliance with urban development and planning regulations in Ibadan, Nigeria;Habitat International,2000
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献