Author:
Choudhari Sanjay,Gajjar Hasmukh
Abstract
Purpose
The purpose of this paper is to present the simulation model for manpower planning in electrical maintenance service facility and evaluates different scenarios to improve resource utilization while meeting the desired service level.
Design/methodology/approach
The process systematically maps entire system of electrical fault rectification, identifies probability distributions of demand of electrical maintenance requests and its process times using historical data. The simulation software Arena was used to model the entire system and various possible improvements were evaluated to assess performance of maintenance service facility.
Findings
The simulation results obtained for the proposed changes in the system indicated the potential improvement in resource utilization while meeting the average waiting time expectations of customers.
Practical implications
The proposed simulation model can help maintenance people to decide the optimum number of resources to meet the agreed performance level that is expected by various stakeholders.
Originality/value
The paper considers the computer simulation in modeling complex real-life system for understanding the resource requirement of electrical fault maintenance facility to improve resource utilization while meeting the desired service level.
Subject
Business, Management and Accounting (miscellaneous),Business and International Management
Reference24 articles.
1. A focussed review of scheduling in services;European Journal of Operational Research,1982
2. Influence of resources on maintenance operations with different asset monitoring levels;Business Process Management Journal,2014
3. State of the art in simulation-based optimization for maintenance systems;Computer and Industrial Engineering,2015
4. Maintenance manpower modelling for a hospital building complex;European Journal of Operational Research,1997
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献