Performance indicators for lifecycle process of public private partnership (PPP) projects in Malaysia

Author:

Ismail SuhaizaORCID,Mohamad Rosnani,Mohd Said JuliaORCID

Abstract

PurposeThis paper has two objectives. The first objective is to examine the important performance indicators of the lifecycle process of public private partnership (PPP) projects. The second objective is to investigate the difference in the perception of the importance of the performance indicators between the public and private sectors.Design/methodology/approachTo achieve the research objectives, the study used a questionnaire survey. The questionnaire was distributed via postal mail to officers of government departments and private sector companies who may have been involved in PPP projects. A total of 237 completed questionnaires were received, representing a 51.52% response rate. To examine the importance of performance indicators, the descriptive statistical tests of mean, standard deviation and mean score ranking were used. Independent t-tests were conducted to investigate the differences in the perceptions of the importance of performance indicators between the two respondent groups.FindingsThe findings show that all the 16 performance indicators are perceived as important and very important. The top five important performance indicators for a PPP project lifecycle process are “Time management”, “Contractual management”, “Cost management”, “Safety management” and “Effective risk management system”, while “stress or conflicts management” is the least important. In terms of the differences in the perception of the public and private sector groups, the results indicate that four indicators (“environment protection”, “cost management”, “effective risk management system” and “good work environment”), show a significant statistical difference between the perception of the public and the private sector respondents.Originality/valueThis study offers empirical evidence on key performance indicators for a PPP project that are crucial throughout its lifecycle as perceived by two key parties in a PPP contract, i.e. the public and the private sectors.

Publisher

Emerald

Subject

Management Science and Operations Research,Civil and Structural Engineering

Reference51 articles.

1. Housing private public partnerships: perspective from the government agencies,2010

2. Achieving best value in private finance initiative project procurement;Construction Management and Economics,2003

3. Interdependency of the critical success factors and ex-post performance indicators of PPP projects;Built Environment Project and Asset Management,2017

4. Crucial silences: when accountability met PFI and finance capital;Critical Perspective on Accounting,2010

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3