Abstract
Purpose
The purpose of this paper is to establish the perception of tradespeople about project-specific constraints (PSCs) influencing construction productivity in Nigeria.
Design/methodology/approach
Using a qualitative descriptive survey comprising face-to-face semi-structured interviews and a purposive sampling method, views of eight groups of tradespeople and seven project managers on live construction projects in Nigeria were collected. The study used conventional content analysis with the aid of NVivo 12 pro computer software for the analysis.
Findings
The research evaluated the PSCs and their effect on construction productivity of tradespeople. The findings identified five key PSCs, namely: lack of promotions/reward system, unsafe/poor health condition of workers, delay in material availability, inadequate site amenities and an ageing workforce. These results support earlier research on constraints influencing labour productivity, however, the poor health condition of workers and material unavailability appear to be more unique when compared to other previous studies.
Research limitations/implications
The study focussed on the Federal Capital Territory Abuja and the Lagos State of Nigeria. It provides insight into the PSCs influencing the productivity of tradespeople in the Nigerian construction industry. Further research to identify the PSCs in depth, in the Eastern part of Nigeria is necessary.
Practical implications
The PSCs influencing tradespeople’s productivity was identified. The level of the relative impact of the PSCs is expected to guide the project team in addressing the PSCs in a method that is cost effective.
Originality/value
This study is original research that has underlined some areas of improvement in construction project performance.
Subject
Management Science and Operations Research,Civil and Structural Engineering
Reference65 articles.
1. Factors affecting construction labour productivity for Malaysian residential projects’, structural survey;The Emerald Research Register,2005
2. Motivational factors impacting the productivity of construction master craftsmen in Kuwait;Journal of Management in Engineering,2013
3. Labour productivity constraints in the Nigerian construction industry;Continental Journal of Environmental Design and Management,2011
4. The vulnerability of motivation schemes in enhancing site workers’ productivity for construction industry’s sustainability in Nigeria;International Journal of Sustainable Construction Engineering & Technology,2013
5. Fatalities in the Nigerian construction industry: a case of poor safety culture;British Journal of Economics, Management & Trade,2014
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献