Author:
Dhingra Ashwani,Chandna Pankaj
Abstract
PurposeIn order to achieve excellence in manufacturing, goals like lean, economic and quality production with enhanced productivity play a crucial role in this competitive environment. It also necessitates major improvements in generally three primary technical areas: variation reduction, equipment reliability, and production scheduling. Complexity of the real world scheduling problems also increases with interactive multiple decision‐making criteria. This paper aims to deal with multi‐objective flow shop scheduling problems, including sequence dependent set up time (SDST). The paper also aims to consider the objective of minimizing the weighted sum of total weighted tardiness, total weighted earliness and makespan simultaneously. It proposes a new heuristic‐based hybrid simulated annealing (HSA) for near optimal solutions in a reasonable time.Design/methodology/approachSix modified NEH's based HSA algorithms are proposed for efficient scheduling of jobs in a multi‐objective SDST flow shop. Problems of up to 200 jobs and 20 machines are tested by the proposed HSA and a defined relative percentage improvement index is used for analysis and comparison of different MNEH's based hybrid simulated annealing algorithms.FindingsFrom the results, it has been derived that performance of SA_EWDD (NEH) up to ten machines' problems, and SA_EPWDD (NEH) up to 20 machines' problems, were better over others especially for large sized SDST flow shop scheduling problems for the considered multi‐objective fitness function.Originality/valueHSA and multi‐objective decision making proposed in the present work is a modified approach in the area of SDST flow shop scheduling.
Subject
Organizational Behavior and Human Resource Management,General Business, Management and Accounting
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献