The purpose of this paper is to develop weights of key performance areas (KPAs) and performance indicators for public private partnerships (PPPs) in Bangladesh. Since a variety of PPP arrangements is observable, different performance measurement approaches exist in the literature. However, analysing the relative importance of indicators influencing the performance score of particular projects using the perspective of developing countries remains unexplored.
Design/methodology/approach
The authors’ method involves application of the analytical hierarchy process (AHP) to develop weights for eight KPAs for which 41 contributing performance indicators have been developed. In total, 68 respondents (62 per cent of the PPP practitioners in Bangladesh) participated in a structured questionnaire survey and their judgements have been found to be consistent, using consistency ratios, a geometric consistency index and one-way ANOVA test.
Findings
“Feasibility analysis”, “life cycle evaluation and monitoring” and “optimal risk allocation” are the most significant performance indicators in Bangladesh. “Financing” is the most important KPA, followed by “planning and initiation” and “transparency and accountability”. Interestingly, unlike the cost, time and quality measures of the public sector comparator analysis used in most developed countries, a different set of indicators and KPAs are found dominant.
Research limitations/implications
This suggests that performance indicators and their weights may differ for developing countries. Future research could usefully focus on testing this model in different countries and applying it to derive performance scores for individual PPPs.
Originality/value
An application of AHP in determining weights of the performance indicators represents a major contribution to the literature on PPP performance measurement in the developing countries including Bangladesh.
Subject
Strategy and Management,General Business, Management and Accounting
Reference69 articles.
1. Public private partnership infrastructure delivery: benefits and costs for society,2015
2. Ali, Z.M., Ibrahim, N.A., Mengersen, K., Shitan, M. and Juahir, H. (2014), “Robust principal component analysis in water quality index development”, paper presented at the AIP Conference Proceedings, Kuala Lumpur, 17-19 December 2013, available at: https://aip.scitation.org/doi/pdf/10.1063/1.4882620 (accessed 5 July 2018).
3. Interdependency of the critical success factors and ex-post performance indicators of PPP projects;Built Environment Project and Asset Management,2017
4. Risk allocation in public-private partnership water supply projects in Ghana;Construction Management and Economics,2015