The empirical reality of project management failures in the construction of social housing projects in South Africa

Author:

Amoah Christopher,Kajimo-Shakantu Kahilu,van Schalkwyk Tanya

Abstract

Purpose The concept of government reconstruction development programme (RDP) social housing in South Africa was rolled out in 1994 after the African National Congress Government came to power when the apartheid rule was abolished. The main aim of the government was to enhance the lifestyles of the poor in society through the provision of houses that they could not afford in the open market. However, many concerns have been reported about the social housing project in terms of poor project implementation and the delivery of deliverables that do not befit the need of the end-users. This study aims to assess the flaws in the application of project management (PM) principles in the construction of these social houses. Design/methodology/approach A quantitative approach was adopted for the study by making use of closed- and open-ended questionnaires to collect data from 1,893 social housing inhabitants in Bloemfontein, Free State. Descriptive statistics and R programming language software were used to analyse the data collected. Findings The findings reveal that there was a profound failure in the application of PM principles in the construction of the social houses leading to the provision of deliverables that do not meet the needs of the beneficiaries. There are also poor project deliverables and lack of consultations that could have probably been prevented had proper PM systems been put in place by the government throughout the project lifecycle. This lack of proper PM philosophies has generated dissatisfaction among the beneficiaries leading to numerous complaints about the social housing programme. Research limitations/implications The survey was done in only RDP housing communities in Bloemfontein in the Free State Province of South Africa; however, the result may be applicable in other RDP housing programmes. Practical implications The empirical results indicate that the government has been providing houses with disregard to project objectives by not instituting an appropriate PM systems; hence, the main objective of providing befitting houses to the less privileged to enhance their living conditions has woefully failed, as the inhabitants do not see any improvement of their social standings after receiving the houses. This means the government might have wasted resources as a result of ineffective PM throughout the project implementation. Originality/value This study has identified PM flaws in the construction of the RDP houses, which have led to poor project deliverables. This study thus gives recommendations with regard to proper PM strategies for the implementation of the same or similar project in the future to achieve project objectives.

Publisher

Emerald

Subject

Management of Technology and Innovation,Strategy and Management,Business and International Management

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3