Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming

Author:

Cajzek Rok,Klanšek Uroš

Abstract

Purpose The purpose of this paper is cost optimization of project schedules under constrained resources and alternative production processes (APPs). Design/methodology/approach The model contains a cost objective function, generalized precedence relationship constraints, activity duration and start time constraints, lag/lead time constraints, execution mode (EM) constraints, project duration constraints, working time unit assignment constraints and resource constraints. The mixed-integer nonlinear programming (MINLP) superstructure of discrete solutions covers time–cost–resource options related to various EMs for project activities as well as variants for production process implementation. Findings The proposed model provides the exact optimal output data for project management, such as network diagrams, Gantt charts, histograms and S-curves. In contrast to classic scheduling approaches, here the optimal project structure is obtained as a model-endogenous decision. The project planner is thus enabled to achieve optimization of the production process simultaneously with resource-constrained scheduling of activities in discrete time units and at a minimum total cost. Practical implications A set of application examples are addressed on an actual construction project to display the advantages of proposed model. Originality/value The unique value this paper contributes to the body of knowledge reflects through the proposed MINLP model, which is capable of performing the exact cost optimization of production process (where presence and number of activities including their mutual relations are dealt as feasible alternatives, meaning not as fixed parameters) simultaneously with the associated resource-constrained project scheduling, whereby that is achieved within a uniform procedure.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference28 articles.

1. Time-cost optimization model considering float-consumption impact;Journal of Construction Engineering and Management,2015

2. Non-linear time-cost trade-off models of activity crashing: application to construction scheduling and project compression with fast-tracking;Automation in Construction,2019

3. Constraint-directed techniques for scheduling alternative activities;Artificial Intelligence,2000

4. Maximising the weighted number of activity execution modes in project planning;European Journal of Operational Research,2018

5. Mixed-integer nonlinear programming based optimal time scheduling of construction projects under nonconvex costs;Tehnicki Vjesnik,2016

Cited by 21 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3