1. 1Sthahl, J.F., “Facility productivity today can be planned, measured and controlled ‐ do it”, Industrial Engineering, June 1990..
2. 2Sims Jr, R., “MH problems are business problems”, Industrial Engineering, May 1990..
3. 3Canen, A.G. and Boaventura Netto, P.O., “An OR group is born”, OR/MS Today, October 1993..
4. 4Jajodia, S., Minis, I., Harhalakis, G. and Proth, J‐M., “CLASS: computerized layout solutions using simulated annealing”, International Journal of Production Research, Vol. 30 No. 1, 1992.
5. 5Heragu, S.S., “Recent models and techniques for solving the layout problems”, European Journal of Operational Research, Vol. 57, 1992, pp. 136‐44.