Abstract
Activation is the process of preparing people, equipment and facilities for moving and start‐up. It is little understood, but integral to the success of facility. It starts well before and extends beyond the phases of commissioning and start‐up. Activation is described in six stages as it interacts with the traditional facility delivery cycle: long‐range planning; prioritization/budgeting; facility planning/design; facility completion; Operation; and criteria update/post‐occupancy evaluation. The outcome was a two‐volume, “user‐friendly” Activation Guide that describes activation for large complex projects in a straightforward way, and which is being used by the 172 major hospitals of the Department of Veterans Affairs in the USA. The process is generic and it could be adapted for use in activations of complex facilities in Europe.
Subject
Building and Construction,Architecture,Human Factors and Ergonomics
Reference4 articles.
1. Architectural Research Consultants, Inc. (1991, VA Delivery Cycle Activation Guide, Vols. 1 & 2, Albuquerque, NM.
2. National Institute of Building Sciences (1985, Hospital User Manual Series Guidelines, Volume 2: Systems Start‐Up Manual, working document, August, 1986.
3. Preiser, W.F.E. (Ed.) (1989, Building Evaluation, Plenum, New York, NY.
4. Preiser, W.F.E. (1995, “POE and facilities management: a new diagnostic tool”, Facilities, Vol. 13 No. 11, October.
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献