1. Bititci, U.S. (1998),“Measuring the integrity of your performance measurement system”,Control, April.
2. Integrated performance measurement systems: a development guide
3. DTI (1995),Factory for the Future: Eureka Project, Factory EU 1005, DTI, London.
4. Hammer, M. (1990), “Re‐engineering work: don’t automate, obliterate”,Harvard Business Review, July‐August, pp. 104‐22.
5. Kaplan, R.S. and Norton, D.P. (1992), “The balanced scorecard: measures that drive performance”,Harvard Business Review, January‐February 1992