Predicting likelihood of cost overrun in educational projects

Author:

Asiedu Richard Ohene,Frempong Nana Kena,Alfen Hans Wilhelm

Abstract

Purpose Being able to predict the likelihood of a project to overrun its cost before the contract signing phase is crucial in developing the required mitigating measures to avert it. Known parameters that permit the timely prediction of cost overrun provide the basis for such predictions. Therefore, the purpose of this paper is to develop a model for forecasting cost overruns. Design/methodology/approach Ten predictive variables known before the contract signing phase of a project are identified. Based on a survey approach, information on 321 educational projects completed are compiled. A multiple linear regression analysis is adopted for the model development. Findings Five variables – initial contract sum, gross floor area, number of storeys, source of funds and contractors’ financial classification are observed to influence cost overruns. The model, however, yields a fairly weak coefficient of determination with a mean absolute percentage error of 30.22 and 138 per cent, respectively. Research limitations/implications The model developed focussed on data only educational projects sampled from three out of the ten administration regions in Ghana based on a purposive sampling approach. Practical implications Policy makers and construction managers working on public projects stand to gain tremendous assistance in formulating and strengthening their own in-house cost forecasting at the precontract phase based on “what if” analysis to generate various alternative predictions of cost overruns. Originality/value Considering the innate nature of cost overruns within the Ghanaian construction industry often resulting to project abandonment, this research presents a unique dimension for tackling cost overruns based on a predictive approach.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference62 articles.

1. Ahiaga-Dagbui, D.D. and Smith, S.D. (2013), “‘My cost runneth over’: data mining to reduce construction cost overruns”, in Smith, S.D. and Ahiaga-Dagbui, D.D. (Eds), Proceedings of 29th Annual ARCOM Conference, Association of Researchers in Construction Management, Reading, MA, pp. 559-568.

2. Dealing with construction cost overruns using data mining;Construction Management and Economics,2014

3. Construction cost prediction for public school buildings in Jordan;Construction Management and Economics,1996

4. Taking forward public procurement reforms in Ghana,2006

5. Factors engendering cost misrepresentation of public sector projects in ghana;International Journal of Sustainable Construction Engineering and Technology,2014

Cited by 21 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3