Investigation into the causes of delay in land acquisition for PPP projects in developing countries

Author:

Babatunde Solomon Olusola,Adeniyi Onaopepo,Awodele Oluwaseyi Alabi

Abstract

Purpose The land is a critical resource for public-private partnerships (PPPs) in infrastructure development. However, acquisition of land for PPP infrastructure projects implementation increasingly becomes problematic in developing countries. Yet, effort at investigating the factors causing a delay in land acquisition for PPP infrastructure projects through an empirical method in developing countries received scant attention. Therefore, the purpose of this study is to identify and critically assess the factors predisposing PPP projects implementation to land acquisition delay in Nigeria using an empirical approach. Design/methodology/approach The study adopted literature review and questionnaire survey. For instance, literature review was used to identify the factors causing delay in land acquisition for PPP projects in developing countries, which was used to design the questionnaire survey culminating in data analysis. To capture a broad perception, the questionnaires were administered to three different primary stakeholder groups comprised public sector authorities (i.e. ministries, department, agencies), concessionaires and lenders/banks involved in PPP projects implementation in Nigeria. Data collected were analysed using mean score, Kruskal–Wallis test and factor analysis. Findings The study revealed the mean score ranking of 22 identified factors causing a delay in land acquisition for PPP projects in Nigeria. The result of factor analysis grouped the 22 identified factors into 4 principal factors, namely, resettlement issues with political interference; non-availability of land with a higher cost of land transactions; weak planning institutions; and rehabilitation issues with extensive legal delays. Practical implications These study findings have implications for both policymakers considering PPP projects and private investors seeking to finance a PPP project in developing countries. Also, the study findings would be useful for the governments in Nigeria and other developing countries to formulate clear policies framework that facilitates the smooth acquisition of land for PPP projects. Originality/value The study will be beneficial to the potential local and foreign private investors and governments by broadening their awareness on impediments in land acquisition for PPP projects in Nigeria and developing countries at large. These study findings are crucial, as not many empirical studies have been conducted in Nigeria and many other developing countries.

Publisher

Emerald

Subject

General Engineering

Reference73 articles.

1. Strengths, weaknesses, opportunities, and threats for public-private partners in infrastructure delivery in Nigeria;Journal of Construction Project Management and Innovation,2011

2. Urban land use planning, policies and management in Sub-Saharan African countries: empirical evidence from Akure, Nigeria,2007

3. Awodele, A.O. (2012), “Framework for managing risk in privately financed market projects in Nigeria”, PhD thesis, Heriot-Watt University, Edinburgh.

4. Babatunde, S.O. (2015), “Developing public-private partnership strategy for infrastructure delivery in Nigeria”, PhD thesis, Northumbria University, Newcastle upon Tyne.

Cited by 24 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3