Risk management in residential projects in the United States: Implementation status, evaluation techniques and barriers

Author:

Adamtey Simon,Kereri James Ogechi

Abstract

Purpose Residential projects frequently suffer from low-risk management (RM) implementation and, consequently, are more likely to fail to meet performance objectives. With RM becoming an essential requirement, the purpose of this study is to investigate RM implementation in terms of status, risk analysis techniques, barriers and impact of RM on residential projects across the USA. Design/methodology/approach Data were collected from 105 general contractors who had completed 3,265 residential projects in the past five years. Data collection was through a US national survey sent out through emails between August and November 2019 to residential general contractor firms. The firms were randomly selected from national organizations, such as the National Association of Home Builders, Associated General Contractors of America and Associated Builders and Contractors. Findings The analysis indicated that RM implementation is still extremely low at 22.27%. However, there was an increase in RM implementation as the cost and duration of projects increased. Direct judgment is the most used technique. Also, the one-sample t-test indicated that the barriers have a significant impact on RM implementation. Multinomial logistic regression results indicated that the impact of lack of management support, lack of money or budget, the complexity of analytical tools and lack of time to perform analysis predict the impact on the overall performance of construction projects. Overall, the results provide empirical evidence, which can influence management’s decision-making regarding RM and improve implementation in residential projects. Originality/value There is a lack of empirical evidence on the impact of barriers to RM implementation on the performance of construction projects. This research contributes to the body of knowledge by bridging this gap through a robust analysis of data collected from real residential projects.

Publisher

Emerald

Subject

General Engineering

Reference64 articles.

1. Isk and its impacts on time and cost in construction projects;Journal of Project Management,2020

2. AGC (2018), “Managing and mitigating risk in today's construction environment. [online]”, available at: www.agc.org/sites/default/files/Files/Safety%20%26%20Health/AGC-FMIRiskManagementSurveryResultsandReport-Final.pdf (accessed 12 July 2019).

3. Risk management in the FL construction industry,2004

4. A study of contribution factors to building failures and defects in construction industry;Procedia Engineering,2011

5. Risk analysis and management in construction;International Journal of Project Management,1997

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Building a cash advance assessment model based on machine learning approach;Proceedings of the 2023 3rd International Conference on Big Data, Artificial Intelligence and Risk Management;2023-11-24

2. The role of big data analytics and organizational agility in improving organizational performance of business processing organizations;Business Process Management Journal;2023-09-12

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3