Author:
Soares Gabriela Pereira,Tortorella Guilherme,Bouzon Marina,Tavana Madjid
Abstract
Purpose
This study aims to propose a method for measuring lean supply chain management (LSCM) maturity based on the main lean practices and existing waste of a supply chain.
Design/methodology/approach
A three-stage approach was developed. First, a thorough literature review was performed to raise concepts and previous findings on maturity models (MMs) and LSCM. This review’s outcomes were then validated by experts in the field using the fuzzy Delphi method (FDM). Subsequently, the proposed model was illustrated and assessed based on a multi-case study.
Findings
All companies attained high outcomes in the elimination of the waste pillar. The pillars of logistics management, continuous improvement and information technology management also stood out in the three organizations’ results. The company with the lowest maturity level operates in a make-to-order production policy, which may harm the lean supply in its supply chain.
Practical implications
The proposed model can reveal external opportunities and threats and internal strengths and weaknesses in supply chains (SCs). It is also capable of providing a clear roadmap for SC improvement in companies.
Originality/value
To the best of the authors’ knowledge, no study to date has proposed a MM in the LSCM context using FDM and considering the crucial relationship between lean practices and wastes.
Reference63 articles.
1. A framework for implementing lean principles in the supply chain management at health-care organizations;International Journal of Lean Six Sigma,2019
2. Assessing the leanness of a supply chain using multi-grade fuzzy logic: a health-care case study;International Journal of Lean Six Sigma,2019
3. A conceptual framework for lean supply chain and its implementation;International Journal of Value Chain Management,2008
4. Lean supply chain performance measurement;International Journal of Productivity and Performance Management,2014
5. Identifying and managing critical waste factors for lean construction projects;Engineering Management Journal,2019
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献