Project cost control: a new method to plan and control costs in large projects

Author:

Jayaraman R.

Abstract

Purpose The purpose of this paper is to reengineer the process of cost management in large projects. Design/methodology/approach Considering the fact most large projects overrun their budgets because of the long time period needed to completion, it was decided to reengineer the cost management. Accordingly costs allocated to packages were reviewed and changed on a dynamic basis. Different types of contingencies were provided. Concepts of package contingency and project contingency were introduced. These were based on the project buffer and feeding buffer concepts popularised by Eliyahu Goldratt. Findings The re-engineered method of cost control worked well and yielded better than expected results, leading to the setting up of a new world record in the completion time for setting up a million tonnes per annum continuous, tandem cold rolling mill to roll steel sheets. Research limitations/implications In view of the total success of the reengineered approach, which was tested out on a large project over three years, it is felt that other projects could also try out this technique, especially since it is along the lines proposed by Eliyahu Goldratt who is an authority on project management. However the success can be better understood if the results of the testing become available. To that extent the contents of the present paper have limitations. Practical implications Large projects can deploy the methodology and complete their projects on time and under budget. Social implications The reengineering of the cost management was done primarily with a view to complete projects under budget. Since many governments spend many billions of dollars on publicly funded projects for the welfare of citizens, the use of this technique could have a salutary effect on the cost. Originality/value The method was innovated in the company by the author’s team and deployed in a live project over four years for the first time to achieve world-class results.

Publisher

Emerald

Subject

Business, Management and Accounting (miscellaneous),Business and International Management

Reference34 articles.

1. Probabilistic control of project performance using control limit curves;Journal of Construction Engineering and Management,2007

2. Cost management in scheduling applications, using the right toolset for cost management;Cost Engineering,2004

3. Cost control systems: benefits provided to claims analysis;AACE International Transactions,2004

4. Using modularisation to manage onshore process plants: a theoretical approach and a case study;Project Management Journal,2002

Cited by 15 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3