Contract administration practices on building information modelling (BIM)-based construction project – an exploratory study

Author:

Alwee Sharifah Nur Aina Syed,Zolkafli Umi Kalsum,Salleh Hafez

Abstract

Purpose The era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in meeting a project delivery. The project actors involved in a BIM process must ensure compliance with all regulations and contractual requirements from inception. While many studies have disclosed the various contractual implications arising from BIM implementation, little has been examined on the current state of BIM in contract administration practice, particularly in the Malaysian construction industry. This study aims to explore the current state of BIM implementation with specific reference to a design-and-build construction project. Design/methodology/approach The exploratory case study involved the construction of a public complex. Semi-structured interviews were carried out with the project actors, and document analysis was performed on the project’s contractual guidelines to derive the findings. Findings Findings from the thematic analysis revealed the following five sequences of activities that guided the contract administration practices, particularly during the pre-contract and post-contract stages of a BIM-based construction project: project inception, tendering phase, detailed design, construction and preparation for the handing over phase. Most of the activities were conducted to deliver the final BIM outputs successfully. Nevertheless, some shortcomings were noted in the project monitoring, the validation process of the BIM deliverables and the BIM players’ competency level in fulfilling the specified BIM contractual requirements. Practical implications The study contributes to a practical understanding of how BIM can affect project administration and how a public client can improve contractual risk allocation in future BIM implementation. Originality/value This paper discloses the current practices of contract administration to better understand the impacts of BIM management during the pre-contract and post-contract stages of a BIM-based construction project.

Publisher

Emerald

Subject

Building and Construction,Architecture,Human Factors and Ergonomics

Reference73 articles.

1. Contractual challenges for BIM-based construction projects: a systematic review;Built Environment Project and Asset Management,2018

2. Enhancing BIM-based information interoperability: dispute resolution from legal and contractual perspectives;Journal of Construction Engineering and Management,2020

3. Building information modeling (BIM): exploring level of development (LOD) in construction projects,2013

4. An analysis of 4D-BIM construction planning: advantages, risks and challenges,2020

5. A comparative case study of coordination mechanisms in design and build BIM-based projects in the Netherlands,2016

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3