Abstract
Purpose
Overall equipment effectiveness (OEE) is a metric for estimating equipment effectiveness of the industrial systems. The purpose of this paper is to identify maintenance improvement potentials using an OEE assessment within the croissant production line.
Design/methodology/approach
The present work is carried out by analyzing the failure and repair data of the line. The failure data cover a period of 15 months. During this period the croissant production line usually operates over the entire day (24 h per day) in three 8-h shifts per day, and pauses at the weekends. Descriptive statistics of the failure and repair data for the line based on scheduled and unscheduled interruptions were carried. Moreover, the actual availability (A), performance efficiency (PE) and quality rate (Q) measures, together with the complete OEE for each working day for the croissant production line, were shown.
Findings
The main objectives are to understand the operation management of the croissant production line, and to measure the OEE characteristics in precise quantitative terms. OEE analysis can help the company to identify the primary problems concerning the A, PE and Q and acts immediately.
Originality/value
This paper presents a successful evaluation of OEE which will provide a useful guide to aspects of the production process, which identifies the critical points of the line that require further improvement through effective maintenance strategy (i.e. total productive maintenance). Moreover, the analysis provides a useful perspective and helps managers and engineers make better decisions on how to improve manufacturing productivity and quality.
Subject
Strategy and Management,General Business, Management and Accounting
Cited by
29 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献