Site inventory tracking in the project supply chain: problem description and solution proposal in a very large telecom project

Author:

Ala‐Risku Timo,Collin Jari,Holmström Jan,Vuorinen Juha‐Pekka

Abstract

PurposeThis paper aims to describe how performance in the project supply chain can be improved by implementing information technology solutions that track site installation and inventory.Design/methodology/approachThe case study was initiated after observing unexpected problems and subsequent performance improvement in a very large project delivery. Personnel involved in the project were interviewed and project documentation was analyzed to identify the reasons for initial poor performance and the changes that lead to the observed improvement.FindingsAs the scale and complexity of a delivery project increases the role of accurate and robust tracking of installation work and inventory increases. Alignment between participants breaks down in the absence of reliable inventory tracking with potentially very adverse effects on project delivery operations. Introducing reliable inventory tracking can very quickly re‐align participants and improve overall performance in a telecom delivery project.Research limitations/implicationsThe findings are based on a case study, with particular characteristics: large number of dispersed installation sites, modular product, remote sensing. Topics for further research are suggested to assess the relevance of inventory tracking in different contexts.Practical implicationsThe case shows how an original equipment manufacturer (OEM) can improve project delivery performance by investing in inventory tracking between inventory drop‐off and installation on the site.Originality/valueProject delivery has received scarce attention in a supply chain management context. This paper contributes to the body of knowledge by showing how site inventory tracking affects performance and alignment of the whole project supply chain.

Publisher

Emerald

Subject

General Business, Management and Accounting

Reference51 articles.

1. Ala‐Risku, T. and Kärkkäinen, M. (2006), “Material delivery problems in construction projects: a possible solution”, International Journal of Production Economics, Vol. 104 No. 1, pp. 19‐29.

2. Alves, T.C.L. and Tommelein, I.D. (2006), “Buffering and batching practices in the HVAC industry”, Proceedings of the 11th Conference of the International Group for Lean Construction, Virginia Tech, Blacksburg, Virginia, 22‐24 July 2003.

3. Artto, K., Heinonen, R., Arenius, M., Kovanen, V. and Nyberg, T. (1998), Global Project Business and the Dynamics of Change, Technology Development Centre Finland and Project Management Association Finland, Helsinki, p. 147.

4. Atkinson, R., Crawford, L. and Ward, S. (2006), “Fundamental uncertainties in projects and the scope of project management”, International Journal of Project Management, Vol. 24 No. 8, pp. 687‐98.

5. Ballard, G. (2000), “The last planner system of production control”, a thesis submitted to the Faculty of Engineering of The University of Birmingham for the degree of Doctor of Philosophy, School of Civil Engineering, Faculty of Engineering, University of Birmingham, Birmingham.

Cited by 16 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3