An off-site construction readiness maturity model for the Indian construction sector

Author:

Bendi Deepthi,Rana Muhammad Qasim,Arif Mohammed,Goulding Jack Steven,Sawhney Anil

Abstract

Purpose This paper aims to present an off-site construction (OSC) readiness maturity model for assessing the readiness of offsite construction companies in the Indian construction sector. Design/methodology/approach The research was conducted in three stages. The first stage consisted of a detailed literature review to document 17 different variables affecting the OSC adoption in India. In Stage 2, 15 semi-structured interviews were carried out where the participants were asked to refine those variables for the Indian context and define what would be different levels of attainment. In the third stage, another set of 5 semi-structure interviews was performed to validate the maturity levels and definitions. Findings A three-level OSC readiness maturity model is presented for discussion. This describes 17 variables at different levels of maturity. Practical Implications The proposed OSC readiness maturity model guides construction practitioners in India through a structured process to enable them to assess their OSC readiness in the market. This assessment enables them to evaluate and benchmark their processes through the strategic and operational phases. The maturity model also identifies the areas of concern and the scope for further development or change to secure the optimal advantage of OSC methods. Originality/value The research produced a model to assess the readiness of OSC adoption in the Indian construction sector. Although the model has been applied to the Indian construction sector, it can easily be modified to accommodate other OSM contexts.

Publisher

Emerald

Subject

Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering

Reference75 articles.

1. Methods for measuring the ‘unmeasurable’: evaluating the benefits of pre-assembly and standardisation in construction,2001

2. Examination of project duration, project intensity, and timing of cost certainty in highway project delivery methods;Journal of Management in Engineering,2018

3. State of off-site construction in India-drivers and barriers;Journal of Physics: Conference Series,2012

4. Construction waste management in India: an exploratory study;Construction Innovation,2012

5. Demystifying the concept of off-site manufacturing method: towards a robust definition and classification system;Construction Innovation,2019

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3