Determining and assessing the significant barriers of transferring unfinished construction projects from the public sector to the private sector in Iran

Author:

Sarvari Hadi,Nassereddine Hala,Chan Daniel W.M.,Amirkhani Mohsen,Md Noor Norhazilan

Abstract

Purpose The government sometimes lacks sufficient financial, management and technical capabilities to deliver construction projects. As a result, it has recognized the need to introduce private sector capital and expertise to complete unfinished construction projects. This outsourcing paradigm is known as a public-private partnership, a form of privatization. This study aims to identify the barriers associated with the transfer of unfinished construction projects to the private sector in Iran and grouped them into areas that were ranked to shed light on where the risk lies. Design/methodology/approach After a thorough and comprehensive literature review, a questionnaire was developed and distributed to 67 experts in the public and private sectors in Iran. The survey included 37 barriers grouped into seven areas and measured on a five-point Likert scale. Face validity, content validity and structural validity of the collected data were confirmed. The reliability of the questionnaire was also tested and validated using Cronbach’s alpha coefficient. Findings The survey findings indicated that private company laws, national constitution, government policies, lack of sufficient regulations, one-sided regulations and lack of balance, the regulations of other organizations and taxation laws were perceived as the major barriers to the transfer of unfinished public sector construction projects to the private sector in Iran. The ranking of the seven areas produced the following top three ranked barriers areas: taxation laws, government policies and one-sided regulations and lack of balance of importance. Originality/value The elicitation of this study can be useful to both private and public sectors for the development of infrastructure construction projects.

Publisher

Emerald

Subject

Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering

Reference46 articles.

1. Construction delays in Iranian civil engineering projects: an approach to the financial security of construction business;Life Science Journal,2013

2. Good project governance for proper risk allocation in public–private partnerships in Indonesia;International Journal of Project Management,2006

3. Effect of government spending and macro-economic uncertainty on private investment in services sector: evidence from Pakistan;European Journal of Economics, Finance and Administrative Sciences,2008

4. Barriers to the implementation of public-private partnerships in the healthcare sector in the kingdom of Saudi Arabia;Plos One,2020

5. Social movement unionism, social movement Partyism, and policy outcomes: health care privatization in El Salvador;Latin American Social Movements: Globalization, Democratization, and Transnational Networks,2006

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3