Integrated measurement of public safety risks in international construction projects in the belt and road initiative

Author:

Xiang Pengcheng,Yang Simai,Yuan Yongqi,Li Ranyang

Abstract

PurposeThe purpose of this paper is to develop a comprehensive understanding of the public safety risks of international construction projects (ICPs) from the perspective of threat and vulnerability. A novel and comprehensive risk assessment approach is developed from a systemic perspective and applied to the Belt and Road Initiative (BRI) to improve the public safety risk management strategy for ICPs in BRI.Design/methodology/approachFirst, a public safety risk indicator system was constructed from the two dimensions, namely threat and vulnerability. Next, an integrated measurement model was constructed by combining the Genetic Algorithm-Backpropagation (GA-BP) neural network, fuzzy comprehensive evaluation method and matter-element extension (MME) method. Data from 49 countries involved in the BRI, as well as five typical projects, were used to validate the model. Finally, targeted risk prevention measures were identified for use at the national, enterprise and project levels.FindingsThe findings indicate that while the vulnerability risks of typical projects in each region of the BRI were generally low, threat risks were high in West Asia and North Africa, Commonwealth of Independent States (CIS) countries and South Asia.Originality/valueFirst, the structure of the public safety risk system of ICPs was analyzed using vulnerability and system theories. The connotation of public safety risk was defined based on two dimensions, namely threat and vulnerability. The idea of measuring threat risk with public data and measuring vulnerability risk with project data was clarified, and the risk measurement was integrated into the measurement results to help researchers and managers understand and systematically consider the public safety risks of ICPs. Second, a public safety risk indicator system was constructed, including 18 threat risk indicators and 14 vulnerability risk indicators to address the gaps in the existing research. The MEE model was employed to overcome the problem of incompatible indicator systems and provide stable and credible integrated measurement results. Finally, the whole-process public safety risk management scheme designed in this study can help to both provide a reference point for the Chinese enterprises and oversea contractors in market selection as well as improve ICP public safety risk management.

Publisher

Emerald

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3