Challenges of BIM implementation in GCC construction industry

Author:

Umar TariqORCID

Abstract

PurposeIn some regions including the Gulf Cooperation Council (GCC) region where construction is one of the main industries, the implementation of BIM is still at a slow rate. This article attempts to know the current situation of BIM and explore the challenges in the BIM implementation in the GCC construction industry.Design/methodology/approachA mixed research approach that includes a systematic literature review and a survey questionnaire was adopted to achieve the aim of this research. For the systematic review, four main databases were search considering a period of 2010–2019 to identify the main challenges in the BIM implementation. A total of 39 different challenges from 47 documents were classified into four main categories. A structured questionnaire developed on these challenges was sent to 206 selected from the top construction organizations from all over the GCC region.FindingsA total of 39 different challenges from 47 documents were classified into four main categories. The respondents for the questionnaire were selected from the top construction organization from all over the GCC region. A large number of the respondents (69.79%) reported that their organizations are planning for BIM implementation in their future projects. The results show that top challenges fall under the main categories of “Organization”, “Technical”, “Government and Legal” and “Environment”.Research limitations/implicationsWhile the paper provides an overview of BIM in a global context, however, the dynamics and maturity of the construction industry in different regions are quite different from each other. Since the data collected in this research is from the GCC region, the results are more relevant to the GCC region.Practical implicationsThe finding of this research identifies the main challenges which GCC construction is facing in the implementation of BIM. The finding will, therefore, be useful for the key stakeholders to develop strategies to overcome these challenges and pave the road to take the advantages of BIM implementation in construction.Social implicationsThe BIM implementation in the GCC construction industry will not only improve the performance of the industry but will also open the doors for new opportunities and employment. The BIM implementation in construction will help the region to achieve Goal 9 (industrial innovation and improved infrastructure) of the United Nations Sustainable Development Goals.Originality/valueThe results of this study help to understand the overall situation including the challenges in the BIM implementation in the GCC construction industry. This study will be helpful for all the stakeholders to develop strategies for the effective implementation of BIM in the GCC construction industry.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference131 articles.

1. Designing out construction waste using BIM technology: stakeholders' expectations for industry deployment;Journal of Cleaner Production,2018

2. Proactive approach for reducing non-value adding activities due to time-space conflicts,1998

3. Delay and cost overrun in infrastructure projects in Jordan;Procedia Engineering,2017

4. Construction delay: a quantitative analysis;International Journal of Project Management,2000

5. Analysing the role of clients in the Jordanian construction supply chain delays;International Journal of Engineering Research and Science and Technology,2017

Cited by 18 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3