Beyond the causes

Author:

Asiedu Richard Ohene,Adaku Ebenezer,Owusu-Manu De-Graft

Abstract

Purpose This paper aims to contend that the circle of investigation into overruns cannot be complete unless the established critical failure factors are matched against their respective mitigating measures to avert the overruns. Extant literature is replete with factors that engender cost and time overruns within the design and construction phase. The constraint is the lack of a scientific approach in establishing a tackling mechanism to address the root causes and stakeholder responsibilities. Design/methodology/approach The research is based on nine unique grand factors previously established and reported in literature about the Ghanaian Construction Industry. A focus group discussion convened through a purposive sampling technique led to the establishment of a list of mitigating measures and strategies. Findings The paper established a checklist of 114 mitigating measures categorised into preventive, predictive and corrective approaches. Additionally, several short to medium term key strategies have been recommended to avert the occurrence of cost and time overruns. Originality/value The mitigating measures can be adopted as a checklist of good practice to help practitioners enhance the effectiveness of project budget and schedule control. It is also supposed to serve as a guide to practitioners in averting overruns through predictive, preventive and/or corrective causes. A unique approach in averting the occurrence of cost and time overruns.

Publisher

Emerald

Subject

Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering

Reference39 articles.

1. Public-private partnership in infrastructure development: case studies from Asia and Europe,2009

2. The impact of contractors’ attributes on construction project success: a post construction evaluation;International Journal of Project Management,2013

3. Taking forward public procurement reforms in Ghana,2006

4. Factors engendering cost misrepresentation of public sector projects in Ghana;International Journal of Sustainable Construction Engineering and Technology,2014

5. Investigating extent and events leading to cost and time overruns of public building projects,2015

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3