Management competencies, complexities and performance in engineering infrastructure projects of Pakistan

Author:

Khattak Muhammad Sajid,Mustafa Usman

Abstract

Purpose The complexity of projects has become a serious issue and obstacle in their successful completion. In order to overcome these complexities, it has become imperative to identify the relevant management competencies of project managers. The purpose of this paper is to address the problem of cost, time and scope in engineering infrastructure projects due to their complexities through management competencies. Design/methodology/approach In the first phase of the study, 32 experts were interviewed through semi-structured pre-tested questionnaire. In this phase, essential elements of complexities were identified initially. This was followed by finding required dimensions of competencies to counter these complexities and to acquire improved performance. In the final stage, required levels of competencies for specific elements of complexity were identified. In the second phase, 85 “project managers” were also approached to get feedback about their recently completed public sector engineering infrastructure projects in Pakistan. Findings The study identified additional dimensions, i.e. honesty, enthusiasm and dedication, in the case of competencies and adverse law and order situation, political instability, land issues, energy crisis and weak authorization of project managers in the case of complexities. Leadership, management skill, communication skill, effectiveness and result orientation were identified as top quality traits required. The study concluded that there is a significant impact of management competencies and complexities on project performance. Originality/value The study contributes to a better understanding of how to improve performance in complex engineering infrastructure projects through adopting management competencies. It also empirically illustrates the relations among project management competencies, complexities and project performance. Although the research is grounded on public sector infrastructure projects, its findings may also be helpful for practices in project management of other sectors.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference111 articles.

1. Afridi, S.F. (2014), “Socio-economic impact of terrorism on Pakistan”, Daily Times, December 21, p. B2.

2. Towards developing competency-based measures for construction project managers: should contextual behaviours be distinguished from task behaviours?;International Journal of Project Management,2008

3. Competencies required by project managers for housing construction in Ghana: implications for CPD agenda;Engineering, Construction and Architectural Management,2009

4. Crime and economic growth in developing countries: evidence from Pakistan;Journal of Basic and Applied Scientific Research,2014

5. Recruiting project managers: a comparative analysis of competencies and recruitment signals from job advertisements;Project Management Journal,2013

Cited by 34 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3