Barriers to risk management in small construction projects in Sri Lanka

Author:

Lebunu Hewage Udara Willhelm AbeydeeraORCID,Wadu Mesthrige JayanthaORCID,Too Eric G.ORCID

Abstract

PurposeThis study explores the current status of risk management (RM) in Sri Lanka and the obstacles in implementing RM in Sri Lankan small construction projects.Design/methodology/approachThe current research study adopted a quantitative research method. Using a purposeful sampling strategy, 100 construction companies engaged in small construction projects in Sri Lanka were selected and a questionnaire was distributed among top managerial employees of these companies. Employees belonging to 47 companies responded to the survey which provided information relating to 812 construction projects. The collected data were analyzed using the RM implementation index (RMII) and other quantitative measures such as mean, median and percentages.FindingsThe research findings indicated that RM incorporation was at a lower degree in small construction projects in Sri Lanka. The findings further indicated that RM incorporation was relatively high in the public construction projects compared to the private construction projects. The main obstacles identified through the survey for RM implementation were: “lack of funding”, “lack of time”, “low profit margin”, “not economical” and “lack of knowledge”.Research limitations/implicationsThe study was limited to exploring RM implementation in small construction projects in Sri Lanka. The study was limited to the building construction companies under the 150-million-rupee (approx. below 450,000 USD) financial limit registered with the construction industry development authority in Sri Lanka.Originality/valueRM in small construction projects in developing countries is a relatively less explored domain. Sri Lankan construction industry is another relatively less explored domain in terms of new management technique implementation such as RM and value management. The quantitative approach used for the study revealed that RM implementation is at a lower degree in the small construction projects. Moreover, several obstacles pertaining to RM implementation were recognized through this study. These findings will be useful for the construction stakeholders to overcome the recognized barriers and effectively use RM in their respective construction projects.

Publisher

Emerald

Reference65 articles.

1. Performance Information Risk Management System: benefits and challenges observed among pilotprojects in Norway NTNU,2022

2. Barriers to risk management process adoption: a qualitative study of project-based construction companies in Iraq,2018

3. Understanding the key factors of operating environment for small and medium contractors in the developing economies: the case of Ethiopia;Journal of Engineering, Design and Technology,2023

4. Effect of knowledge management on growth performance in construction industry;Management Decision,2016

5. Risk analysis and management in construction;International Journal of Project Management,1997

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3