Ojiako Udechukwu,Johansen Eric,Greenwood David
Abstract
PurposeFailure is encountered regularly within project‐based industries and there has been research for decades into this phenomenon. Much of it has considered the failure of projects in terms of the classic project progress issues such as time, cost and quality. Using cases from two major industries the authors aim to develop a different understanding of project measurement criteria. This work is part of a larger completed investigation into information systems and information technology (IS/IT) project management models, developed for industry comparisons.Design/methodology/approachDuring the study, the concept of project failure and success is investigated. The authors carry out a UK‐based, grounded study of two project‐based industries of differing maturity levels (construction and IS/IT) to investigate measures of project failure or success across the two industries.FindingsThe paper presents a reassessment of project measurement criteria. This is based on the separation of measures for project performance and project progress.Research limitations/implicationsThe adopted strategy of naturalistic inquiry has always been susceptible to the criticism that it relies too much on subjective interpretation of data. In addition, no clear relationship was established between the factors discussed and the criteria for measuring project success.Originality/valueThe paper discusses current differences in perception of what actually constitutes a failed or successful project. The paper highlights that often two different (but closely related) concepts, are being discussed by project stakeholders.
Subject
Industrial and Manufacturing Engineering,Strategy and Management,Computer Science Applications,Industrial relations,Management Information Systems
Reference76 articles.
1. Agarwal, N. and Rathod, U. (2006), “Defining ‘success’ for software projects: an exploratory revelation”, International Journal of Project Management, Vol. 24 No. 4, pp. 358‐70.
2. Andersen, E., Birchall, D., Jessen, S. and Money, A. (2006), “Exploring project success”, Baltic Journal of Management, Vol. 1 No. 2, pp. 127‐47.
3. Anwar, M. and Tuqan, A. (2006), “Information needs and use in the construction materials sector in Kuwait”, The Electronic Library, Vol. 24 No. 3, pp. 335‐46.
4. Atkinson, R. (1999), “Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria”, International Journal of Project Management, Vol. 17 No. 6, pp. 337‐42.
5. Bandler, J. (2003), “Kodak's net falls 61%, hurt by switch to digital”, The Wall Street Journal, Vol. 242 No. 17.
Cited by
46 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献