Author:
Shariat Alavi Mahsa,Fallahi Alireza,Mottaki Zoheir,Aslani Fereshteh
Abstract
Purpose
As a flood-prone region in Iran, Golestan province has encountered various disasters in its history. The last one occurred in March 2019, affected Aq-Qala County and caused irreparable physical, economic, social and environmental problems. The purpose of this study is to investigate the process of providing shelter in emergency, rehabilitation and reconstruction phases after the floods in the villages of Aq-Qala.
Design/methodology/approach
A research method is a hybrid approach. The collection of data involved a combination of qualitative and quantitative approaches in addition to reviewing the documented texts in resources to collect the required data using observations, field survey activities, questionnaires and in-depth interviews. From April 2019 to December 2019, nine separate visits have occurred to collect the needed information.
Findings
This paper shows dissatisfaction with providing shelter and attempts to identify the factors which caused the challenges. The findings revealed issues such as hygienic problems in collective camps, lack of thermal resistance in temporary accommodations and rising material prices. These findings lead to a contributive list of suggestions avoiding the recurrence of the harms in the future.
Originality/value
This study proposes solutions and approaches to improve the post-flood settlement process for possible floods in the future such as equipped camps, proper temporary housing, monitoring the reconstruction and the price of the materials. If these approaches are used by authorities and people in similar rural areas, the long-term effects of inadequate post-flood shelter can be reduced.
Subject
Safety, Risk, Reliability and Quality,Building and Construction
Reference27 articles.
1. Flood hazard assessment of the urban area of Tabuk city, kingdom of Saudi, Arabia;Sensors,2019
2. Arsalan, H. and Cosgun, N. (2007), The Evaluation of Temporary Earthquake Houses Dismantling Process in the Context of Building Waste Management. International Earthquake Simposium Kocaeli
3. Housing reconstruction after conflict and disaster,2003
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献