Exploring Indian post-disaster temporary housing strategy through a comparative review

Author:

Biswas Arindam

Abstract

Purpose Natural disasters not only cause dilapidated buildings and damaged infrastructure but also delay crucial aid for those affected in the event of a disaster and post-disaster recovery. An institutionally well-managed post-disaster housing strategy provides opportunities for physical and mental healing of its occupant. The time requires occupiers to remain in the temporary housing varies with circumstances. This paper aims to review post-disaster housing scenarios in India in comparison to two Asian cases from Indonesia and Japan. The study focuses on understanding Indian post-disaster housing strategies through a comparative review. Design/methodology/approach The research selects coastal cities of Tamil Nadu state, where the post-disaster temporary shelter and rehabilitation was planned and implemented after the Tsunami in 2004. The Tsunami created havoc in Nagapattinam and Kanyakumari district of Tamil Nadu. Nagapattinam district reported 6,051 fatalities and many more homeless people. After the Tsunami, the government took measures to supply safe, secured and on-site shelter provisions. Surprisingly, many such shelters were never occupied. In many instances, people actually preferred to spend years in a temporary shelter rather occupying government housing. This paper evaluates such events and investigates India’s post-disaster shelter strategy against the derived best practices. This study is based on the sequential/logical reasoning and understanding of the facts. Discussions and findings from this study can be further generalised into a comprehensive policy discussion. Findings The paper finds that the manner of planning and design of post-disaster housing programmes influence medium- to long-term recovery of its occupant. A certain element of trade-off between implementation and quality of habitation results into compromises to achieving the desired outcome. When faced with socio-political, economic and financial constraints, the decision-makers are required to make trade-offs in deciding the manner and quantum of allocating resources. Coordination among these agencies is troublesome. It is true for all countries and there is no distinct answer to it. Public consultation and community participation in long-term rehabilitation are crucial to meet the aspiration of the local people. Originality/value The paper contributes in discussing a comparison of post-disaster housing rehabilitation between India and the two cases from Indonesia and Japan. As a review paper, the objective is to highlight the synthesis and overall understanding of post-disaster housing strategies from two cases and compare it with India.

Publisher

Emerald

Subject

Safety, Risk, Reliability and Quality,Building and Construction

Reference49 articles.

1. Research techniques in housing;Journal of ‘the Indian Institute of Architects,2008

2. A capability based approach in identifying housing affordability for urban poor in India,2016

3. Towards inclusive development from dispersed regional economic growth and inequality: possibilities and trends of Indian urbanization,2012

4. Planning and design interventions for post disaster temporary housing in India,2018

Cited by 16 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3