Author:
Rohr Sandra S.,Corrêa Henrique L.
Abstract
The objective of the paper is to report research carried out over two years aiming at developing a framework to support the management of manufacturing organizations for whom reducing throughput time is strategically important, either because they compete based on short lead times or because they choose to pursue other objectives such as cost reduction by means of reducing their manufacturing cycle times. A step‐by‐step method is proposed based on the analyses of a number of Brazilian “best practice” cases (all manufacturing companies and all part of large multi‐national corporations) and on the relevant literature.
Subject
Management of Technology and Innovation,Strategy and Management,General Decision Sciences
Reference24 articles.
1. Azzone, G., Masella, C. and Bertelè, U. (1991, “Design of performance measures for time‐based companies”, International Journal of Operations & Production Management, Vol. 11 No. 3, pp. 77‐85.
2. Barker, B. (1993, “Value‐adding performance measurement: a time‐based approach”, International Journal of Operations & Production Management, Vol. 13 No. 5.
3. Bertehzzaghi, E., Spina, G. and Verganti, R. (1994, “Lead‐time models of business processes”, International Journal of Operations & Production Management, Vol.14 No. 5, pp. 5‐20.
4. Blackburn, J. (1990, “The time factor”, National Productivity Review, Vol. 9 No. 4, Autumn, pp. 395‐408.
5. Bower, J.L. and Hout, T.M. (1988, “Fast‐cycle capability for competitive power”, Harvard Business Review, November‐December..
Cited by
20 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献