1. Cochran, D.S. (1999), “The production system design and deployment framework”,Proceedings of the 1999 SAE International Automotive Manufacturing Conference, Detroit, MI, 11‐13 May.
2. Cochran, D., Duda, J., Linck, J. and Taj, S. (1998), “Design of manufacturing cells using a combination of new and existing equipment”,Proceedings of the 9th Annual Meeting of the Production and Operations Management Society, Santa Fe, NM, 28‐31 March.
3. Duda, J., Castaneda‐Vega, J., Cochran, D., Baur, M., Anger, R. and Taj, S. (1999), “Application of a lean cellular design decomposition to automotive component manufacturing system design”,Proceedings of the 1999 SAE International Automotive Manufacturing Conference, Detroit, MI, 11‐13 May.
4. Ellegood, W., Taj, S. and Hendricks, S. (2000), “Design of volume flexible linked‐cell production system for capital intensive automotive component”,Proceedings of the Third World Congress on Intelligent Manufacturing Processes and Systems, Cambridge, MA, 28‐30 June.
5. Goodson, E. (2002), “Read a plant fast”,Harvard Business Review, May, pp. 105‐13.