Author:
Osuizugbo Innocent Chigozie,Okolie Kevin Chuks,Oyeyipo Opeyemi Olanrewaju
Abstract
PurposeDue to the need to enhance the buildability of building designs in building construction industry, a buildability assessment framework was developed for use in Nigeria. This paper aims to investigate and determine the factors influencing buildability assessment implementation in the Nigerian construction industry with the view to improving buildability of building designs. To address the aim, this study will provide answers to the following research question: what are the factors hindering and supporting the implementation of buildability assessment in the Nigerian construction industry?Design/methodology/approachSurvey research method was adopted for the study. Questionnaires were administered to purposively selected group of architects, engineers, builders and quantity surveyors involved in construction project delivery within the client, consulting and contracting organisations in Nigeria. A total of 368 questionnaires were distributed among the sampled participants, out of which a total of 219 representing 60% were sufficiently filled and returned. Data collected were analysed using inferential and descriptive statistics.FindingsThe results revealed owner’s commitment, clients’ awareness of the benefits of conducting buildability assessment on building design, unity among different professionals in the construction industry, designers consider buildability important, adequate coordination among different design disciplines, adequate channel for coordination and communication between designers and constructors at the design stage and adequate support from the government as the topmost seven factors supporting buildability assessment implementation in the construction sector of Nigeria. Second, the study revealed that poor coordination among different design disciplines, lack of buildability assessment awareness, design review pattern where construction personnel (builders) are invited to assess the building production information, unwillingness to invest extra money and effort during the early stage of project and designers value aesthetics and functionalities more than buildability in their designs are the topmost five factors hindering buildability assessment implementation in the Nigerian construction industry.Originality/valueThe study provides detailed insights into the factors supporting and hindering buildability assessment implementation in the Nigerian construction industry. The findings indicate the need to enlighten principal stakeholders in construction about buildability and the outcome of the buildability assessment tool. This information can motivate principal stakeholders in implementing and practising buildability assessment.
Subject
Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering
Reference42 articles.
1. The perception of future decision makers on the building profession;Malaysian Construction Research Journal,2017
2. Buildability problems in construction projects in Nigeria: causes and impacts;European Scientific Journal,2015
3. An assessment of buildability problems in the Nigerian construction industry;Global Journal of Research Engineering,2011
4. Identification of coordination factors affecting building projects performance;Alexandria Engineering Journal,2016
5. Critical issues in reforming the Nigerian construction industry;British Journal of Applied Science and Technology,2015
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献