An economic production model with imperfect quality components and probabilistic lead times

Author:

El-Kassar Abdul-Nasser,Ishizaka Alessio,Temouri Yama,Al Sagheer Abdullah,Vaz Daicy

Abstract

PurposeThis study investigates a production process that requires N kinds of components for the production of a finished product. The producer orders the various kinds of components from different suppliers and receives the orders in lots at the beginning of each production cycle. Similar to situations often encountered in real life, the lead times are random variables with known probability distributions so that a production cycle starts whenever all N kinds of components become available. Each of the lots received at the start of a production run contains both perfect and imperfect quality components. Once all N kinds of components become available, the producer initiates a screening process to detect the imperfect components. The production of the finished product uses only perfect quality components. The imperfect components are removed from inventory whenever the screening process is completed. The percentage of components of perfect quality present in each lot is a random variable with a known probability distribution.Design/methodology/approachThis production process is described and modeled mathematically and the optimal production/ordering policy is derived based on the mathematical model.FindingsThe formulated mathematical model resulted in the determination of the optimal policy consisting of the optimal number of finished items ordered to be produce during each production run, the number of components ordered from each supplier, and the reorder point. The derived closed form expression for the optimal lot size depends on the minimum of the number of perfect quality components in a lot, whereas the reorder point is determined based on the maximum lead time.Practical implicationsThe modeling approach and results of this study provide practical implications that may be beneficial to both production and supply chain managers as well as researchers.Originality/valueThis modeling approach that incorporates decision-making related to the logistics of acquiring the components and accounts for the probabilistic nature of the lead times and quality of components addresses a gap in the logistics/production literature.

Publisher

Emerald

Subject

Transportation,Business and International Management

Reference41 articles.

1. A century of evolution from Harris’s basic lot size model: survey and research agenda;International Journal of Production Economics,2014

2. Postponement implementation in integrated production and inventory plan under deterioration effects: a case study of a juice producer with limited storage capacity;Production Planning and Control,2019

3. Integrated supply chain risk management via operational methods and financial instruments;International Journal of Production Research,2014

4. Impact of lead time variability in supply chain risk management;International Journal of Production Economics,2016

5. Big data analytics in operations management;Production and Operations Management,2018

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3