A grey mathematical model for crashing of projects by considering time, cost, quality, risk and law of diminishing returns

Author:

Mahmoudi Amin,Feylizadeh Mohammad Reza

Abstract

Purpose The purpose of this paper is to examine projects crashing based on the factors including cost, time, quality, risk and the law of diminishing returns. Design/methodology/approach The paper first investigated effective factors on project crashing then proposed a grey linear programming model. In the proposed grey linear programming model, the costs of quality of works that include the cost of conformance and non-conformance of deliverables in the project were studied. The results are presented for considering the existing uncertainties using positioned programming under the sensitivity analysis table and graphs. Findings The lack of consideration of project risks will reduce the project success probability in future. The proposed model reduces the existing uncertainties to a significant extent by covering the project risks completely. Based on the law of diminishing returns, after a certain point technically known as saturation point, the increase of resources does not lead to the reduction of time and may even have negative impacts. Finding the saturation point for each activity prevents the excessive allocation of resources that can lead to reduction of productivity. Practical implications The main duty of each project manager is finishing the project in the framework of the determined objectives. In most of the cases, after the preparation of the initial project schedule by the project team, it is seen that there is a need for the time reduction. This study has used a grey linear programming model for optimum crashing of project activities. In order to make the model more realistic and applicable, the authors endeavoured to consider most of the factors that are involved in doing a project. Originality/value In the present study, to the best of the authors’ knowledge the factors of time, cost, quality, risk and the law of diminishing returns are simultaneously considered in project crashing for the first time and the grey theory was used for considering the uncertainties of project parameters. Also, “the law of diminishing returns” has not been considered during crashing in the studies conducted so far.

Publisher

Emerald

Reference50 articles.

1. Multi-objective optimization of time-cost-quality using multi-colony ant algorithm;Asian Journal of Civil Engineering (Building and Housing),2007

2. Discrete particle swarm optimization method for the large-scale discrete time-cost trade-off problem;Expert Systems with Applications,2016

3. Project management with time, cost, and quality considerations;European Journal of Operational Research,1996

4. Time, cost, and quality trade-offs in material requirements planning using fuzzy multi-objective programming;Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture,2012

5. Branch and bound based solution algorithms for the budget constrained discrete time/cost trade-off problem;Journal of the Operational Research Society,2013

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3