Abstract
Purpose
Material handling (MH) is an important facility in any manufacturing system. It facilitates the transport of in-process material from one workstation (WS) to another. MH devices do imply incurring capital costs and, therefore, minimizing their deployment without compromising on smooth material flow will ensure savings in addition to the optimal use of productive shop floor space and, avoid space cluttering. The purpose of this paper is to evaluate the minimal network that connects all the WSs, therefore ensuring economic and safe manufacturing operations.
Design/methodology/approach
Graph theoretical approach and Prim’s algorithm for minimal spanning tree is used to evaluate the minimal span of the MH devices. The algorithm is initialized by translating the graph of WSs into a distance matrix to evaluate the minimal MH network.
Findings
The minimal length of the MH devices is evaluated for a typical case study.
Research limitations/implications
The step-by step methodology explained in the manuscript acts as a good guide for practicing operational managers. The shortcoming of the methodology is that, it presumes the use of modular MH devices that will need to be reconfigured based on dynamic changes to the manufacturing system.
Practical implications
The methodology is explained in detail to enable the practicing managers to use it for designing their MH networks in any manufacturing system.
Originality/value
There is no evidence to indicate the use of minimal spanning tree algorithm for design of MH networks in a manufacturing system. This paper attempts to fill this gap.
Subject
General Business, Management and Accounting
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献