Risk management and contingency sum of construction projects

Author:

Lam Terence Y.M.,Siwingwa Njavwa

Abstract

Purpose Most organisations do not have established guidelines for the estimation and management of contingency funds. The purpose of this paper is to identify the risk factors at the construction phase causing project cost overruns, and a reliable method for the estimation of contingency sum is established. Design/methodology/approach Combined qualitative–quantitative exploratory methods were used. Qualitative interviews were conducted with five expert practitioners working in a Public Works Department in Zambia to determine how contingency sum is estimated and to explore what risk factors should be considered. Quantitative regression used cost and risk data collected from 30 recently completed building and refurbishment projects. Findings The qualitative study indicated that the project budget overruns constitute a major issue. This finding is in line with the paired-samples t-test results which show that the difference between the total variations and the initial contingency sum tends to be significant. The regression analysis proved that the contingency sum was positively correlated to the estimated contract sum. The qualitative interview results and Pearson correlation analysis also showed that contingency sum and project complexity tend to have a significant correlation. The research also demonstrates that the type of works is not a direct significant factor. Research limitations/implications Because the projects used for the study were relatively short, duration of the project and economic factor of tax rate, exchange rate and inflation rate were not examined in the multiple regression analysis. Further studies should be conducted on longer projects to test out whether these risk factors are significant in influencing the project contingency. Practical implications The results demonstrate that the multiple regression method can be applied as a reliable tool to predict contingency sums. Accurate contingency sums and project budget estimates benefit construction clients and their project managers. Individual project conditions should be carefully examined when assessing the contingency. Originality/value This research establishes a reliable regression method for the assessment of the contingency for the pre-tender estimate which has significant impact on the project feasibility and cost control, using related risk factors involved in construction contingency and client’s contingency.

Publisher

Emerald

Subject

Economics and Econometrics,Finance,Accounting,Business and International Management

Reference39 articles.

1. Rethinking construction cost overruns: cognition, learning and estimation;Journal of Financial Management of Property and Construction,2005

2. Modelling building construction durations;Journal of Financial Management of Property and Construction,2015

3. The concept of project complexity - a review;International Journal of Project Management,1996

4. Estimating project cost contingency - a model and exploration of research questions,2004

5. Understanding project cost contingency - a survey,2005

Cited by 18 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3