Author:
Burgess T.F.,Ong T.S.,Shaw N.E.
Abstract
PurposeThe paper seeks to examine the prevalence of traditional versus contemporary (balanced) types of performance measurement system (PMS) in an emerging economy and link incidence to key organisational factors of size, age and ownership.Design/methodology/approachData on design and use of PMSs are collected through a questionnaire survey (n=149) of electrical and electronic firms. Hierarchical cluster analysis identifies two PMS groups and assigns them to traditional and contemporary types, and then links them to key organisational factors via contingency tables.FindingsUse of contemporary PMS dominates the sample. PMS type is significantly associated with size and ownership, while age is not. Firms more likely to use contemporary PMSs are foreign‐owned and large in terms of number of employees.Research limitations/implicationsThis survey‐based research employs multivariate analysis and therefore standard limits for such statistical work apply. Results rely on hierarchical cluster analysis.Practical implicationsIf balanced approaches are more effective, as is argued by many, then a firm without such a style of PMS is at a competitive disadvantage given the high incidence of use.Originality/valueThe paper establishes a framework for a contemporary type of PMS that integrates balanced scorecard and other balanced approaches, then collects data in an emerging economy. Links use of contemporary PMS type to key organisational factors.
Subject
Strategy and Management,General Business, Management and Accounting
Reference66 articles.
1. Abdul, H.A.S. (1995), Vision 20:20 Selangor Darul Ehsah, Pelanduk Publication, Malaysia.
2. Trade and Industry Committee (1994), Competitiveness of UK Manufacturing Industry, Trade and Industry Committee, House of Commons, London.
3. Azzone, G., Masella, C. and Bertele, U. (1991), “Design of performance measures for time‐based companies”, International Journal of Operations & Production Management, Vol. 11 No. 3, pp. 77‐85.
4. Barsky, N.P. and Bremser, W.G. (1999), “Performance measurement, budgeting and strategic implementation in the multinational enterprise”, International Journal of Operations & Production Management, Vol. 25 No. 2, pp. 3‐15.
5. Berthon, P., Pitt, L. and Katsikeas, C. (1999), “Marketing and technical managers: an interfunctional exploration of problem perception”, European Journal of Marketing, Vol. 33 Nos 7/8, pp. 772‐92.
Cited by
29 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献