Modelling marketing resources, procurement process coordination and firm performance in the Malaysian building construction industry
-
Published:2015-11-16
Issue:6
Volume:22
Page:644-668
-
ISSN:0969-9988
-
Container-title:Engineering, Construction and Architectural Management
-
language:en
-
Short-container-title:
Author:
Othman Akmal Aini,Abd Rahman Sofiah,Sundram Veera Pandiyan KalIani,Bhatti Muhammad Awais
Abstract
Purpose
– The purpose of this paper is to establish a link between marketing resources, procurement process coordination (PPC) and firm performance. To allow for greater understanding in the field of supply chain management, the present study looked into the coordination between the construction firms and their main building materials suppliers.
Design/methodology/approach
– This study employed the quantitative method where stratified random sampling and self-administrated questionnaires were sent to respondents in the construction industry. The research framework was tested using structural equation modelling technique.
Findings
– The empirical result revealed that marketing resources have positive and significant effects on PPC dimensions. It was also found that PPC (mainly joint operation planning and supplier relationship development dimensions) has significant positive relationship towards firm performance.
Research limitations/implications
– This study focused solely on the firms in the construction industry and data collection was on a single respondent basis.
Practical implications
– The findings of this study underlines some implication and suggests that construction industry players adopt and emphasise such orientations in order to enhance their performance – operational and customer performance in particular.
Originality/value
– This study employed a newly developed framework based on the existing theoretical arguments to empirically examine the link between marketing resources, PPC and firm performance and offers fresh insights on the effects of PPC in linking marketing resources and firm performance. Besides that, since there are very limited studies that have taken the initiative to specifically list down the activities involved in the PPC, mainly in the context of the construction industry, this study offers a significant contribution.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference108 articles.
1. Abramson, R.
,
Rahman, S.
and
Buckley, P.
(2007), “Tricks and traps in structural equation modeling: a GEM Australia example using AMOS graphics”, ABBSA Conference, Cairns, pp. 558-599. 2. Agan, Y.
(2005), “A resource-based approach to supply chain integration”, PhD thesis, University of Memphis, Memphis. 3. Akintoye, A.
,
McIntosh, G.
and
Fitzgerald, E.
(2000), “A survey of supply chain collaboration and management in the UK construction industry”,
European Journal of Purchasing and Supply Management
, Vol. 6, pp. 159-168. 4. Arbuckle, J.L.
(2007),
AMOS 16.0 User’s Guide
, AMOS Development Corporation. 5. Arshinder, N.A.
,
Kanda, A.
and
Deshmukh, S.
(2006), “A coordination-based perspective on the procurement process in the supply chain”,
Int. J. Value Chain Management
, Vol. 1 No. 2, pp. 117-138.
Cited by
14 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
|
|