Purpose Project delays and cost over-runs are few common major problems arising from conventional contracts. To overcome these issues, the Hong Kong Government has been practicing the use of the New Engineering Contract (NEC) forms in several public works projects. However, despite the successful outcomes and the positive signs of adopting NEC, it appears that NEC forms of contracts are not widely adopted in the Hong Kong construction industry even after 25 years of their first introduction. The purpose of this paper is to identify the challenges and barriers for not implementing NEC widely in Hong Kong. Design/methodology/approach Based on a questionnaire survey data collected from 45 senior industry professionals, and six semi-structured interviews, the study evaluated the perceptions of construction professionals as to why NEC is still not popular in the industry and reported the relative importance of challenges in the implementation of NEC in Hong Kong. Findings The results reveal that “People are not willing to change,” “Limited number of trained professionals” and “Insufficient case law and adjudication experience” are the most significant challenges and barriers in adopting NEC. These findings are also supported by the opinions of construction professionals through semi-structured interviews. Practical implications The findings are relevant and would benefit to the industry stakeholders for adopting NEC contracts by informing them of the most significant challenges so that proper strategies may be devised to overcoming them for early contractors’ involvement, controlling cost and time overruns in infrastructure projects. Originality/value The empirical evidence of the study provides an insight into the challenges faced by the construction industry of Hong Kong. NEC form of contract is the way forward in order to create a better working environment conducive for all the parties that would result in better construction project performance and productivity.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference71 articles.

1. Mixed method research: fundamental issues of design, validity, and reliability in construction research;Journal of Construction Engineering and Management,2010

2. Project partnering-a case study on MTR corporation Ltd’s Tseung Kwan O Extension,2000

Cited by 18 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3