Author:
Chanda Emmanuel K.,Gardiner Steven
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference7 articles.
1. Alehossein, H. (2002), “Data mining for miners – the general mixed model (GMM)”,Exploration and Mining Research News, Vol. 14, pp. 6‐8.
2. Blackwell, G.H. (1999), “Estimation of large open pit haulage truck requirements”,CIM Bulletin, Vol. 92 No. 1028, pp. 143‐69.
3. Evaluation of success probability in multiple seam room-and-pillar mining
4. Edwards, D.J. and Griffiths, I.J. (2000), “Artificial intelligence approach to calculation of hydraulic excavator cycle time and output”,Mining Technology: Transactions of the Institute of Mining and Metallurgy, Section A, Vol. 109 No. 1, pp. 23‐9.
5. ESTIVATE: a model for calculating excavator productivity and output costs
Cited by
27 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献