Abstract
PurposeConstruction projects in Malaysia are often delayed and over budget due to heavy reliance on labor. Linear regression (LR) models have been used in most labor cost (LC) studies, which are less accurate than machine learning (ML) tools. Construction management applications have increasingly used ML tools in recent years and have greatly impacted forecasting. The research aims to identify the most influential LC factors using statistical approaches, collect data and forecast LC models for improved forecasts of LC.Design/methodology/approachA thorough literature review was completed to identify LC factors. Experienced project managers were administered to rank the factors based on importance and relevance. Then, data were collected for the six highest ranked factors, and five ML models were created. Finally, five categorical indices were used to analyze and measure the effectiveness of models in determining the performance category.FindingsWorker age, construction skills, worker origin, worker training/education, type of work and worker experience were identified as the most influencing factors on LC. SVM provided the best in comparison to other models.Originality/valueThe findings support data-driven regulatory and practice improvements aimed at improving labor issues in Malaysia, with the possibility for replication in other countries facing comparable problems.
Subject
Building and Construction,Civil and Structural Engineering
Reference39 articles.
1. An exponential chaotic differential evolution algorithm for optimizing bridge maintenance plans;Automation in Construction,2022
2. The support of continuous information flow through building information modeling (BIM);The 10th International Conference on Engineering, Project, and Production Management,2020
3. Labour productivity statistics: a reality check for the Norwegian construction industry;International Journal of Construction Management,2020
4. Factors affecting construction labour productivity in Yemen;International Journal of Construction Management,2019
5. Causes of cost overruns in building construction projects in Asian countries; Iran as a case study;Engineering, Construction and Architectural Management,2022
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献